Tallgrass Energy Battery Decommissioning
Facilities included: pumpjack; 2000 BBL tanks, flare stacks, compressor building, separators, FWKO building; treater building, office/MCC building, tanks, storage shed, tubing; electrical panel, chemical tanks, barrels, UST, septic tanks, inlet building; injection building.
Licensed pipelines (25) were pigged clean as part of abandonment with all on-site portions removed and cut, plugged and tagged at the lease boundary.